Inquiry NowRenovation Of Pond In Front Of in Gorakhpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renovation Of Pond In Front Of" in Gorakhpur, India.
Gorakhpur Industrial Development Authority
Gorakhpur, Uttar Pradesh, India
NTID 44411873
- Opening Date : Mon 30th March, 2026
- Closing Date : Mon 30th March, 2026
- ₹ 3921101.00
- NTID 44411873
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
393000.00 -
Document Cost
1770.00 -
Estimated Cost
3921101.00
BOQ Items Total Items : 10 | Total Qty : 5789.36
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation grass, bush, wood, trees and saplings of girth up to 30cm., Measured at a height of 1 m. above ground level & removal of rubbish upto a distance of 50m. Outside the periphery of area cleared. | 3250.00 | Sqm |
| 2 | Supply and filling of carted earth from a distance not exceeding 7 KM from the site of work and including cost of earth and all materials, labour T & P etc. Earth work in cutting or embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 0.50mtr. in depth and earth work in embankment & subgrade and earthen shoulders to be in 20cm Layers, including ramming and dressing the surface to required levels and slops and also including 1.5 meter lift and 30 meter lead | 621.00 | Cum. |
| 3 | Cement concrete with 4 cm. (1 ") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. | 142.20 | Cum. |
| 4 | R.C.C. work with cement approved coarse sand and 2 cm (3/4") gauge approved stone grit in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.l. binding wire and includuing Necessary centering and shuttering etc.and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item.as peAs in item 283 above but in R.C.C. Raft foundation and footing with 4 cm. (1 ')gauge approved stone ballast. S.I 287 | 93.15 | Cum. |
| 5 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504 only use for sail brand Tmt bar | 36.56 | Qtl |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054