- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of WATER RESOURCES DEPARTMENT
- >
NTID 46108815
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRenovation Of Pipe Line Lift I in Hazaribag - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renovation Of Pipe Line Lift I" in Hazaribag, India.
- Opening Date : Wed 12th August, 2026
- Closing Date : Mon 10th August, 2026
- ₹ 7700694.00
- NTID 46108815
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
154014.00 -
Document Cost
10000.00 -
Estimated Cost
7700694.00
BOQ Items Total Items : 58 | Total Qty : 14099615.51107
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | E/W in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50m. Including all lifts, levellings, ramming the foundation trenches, removing roots of trees,shrubs all complete job as per approved design, building specification and direction of E/I. (5.1.1) BCD | 873.98 | M3 |
| 2 | Earth work in excavation in foundation trenches as per designed section in ordinary soil, including moorum soil, soil mixed with kankar, pebles and boulders upto 300mm size and disposal of of the same (beyond 50 m away from the toe of dam in the country side) within initial lead of 150m and initial lift of 1.5m as per direction and specification of E/l. (6.1.8 Part-B WRD) | 140.53 | M3 |
| 3 | Extra for earth work in hard soil as per specification and direction of E/I.(Vide classification of soil item- B). (5.1.2 BCD) | 247.66 | M3 |
| 4 | Providing clean coarse sand filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials,labour,royalty and taxes all complete job as per building specification and direction of E/I. (Mode of measurement compacted volume).(5.1.10 BCD) | 87.41 | M3 |
| 5 | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete job as per building specification and direction of E/I. (5.6.1. BCD) | 822.14 | M2 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054