- Home
- >
- Tender
- >
- Andaman and Nicobar Islands Tender
- >
- Department of ANDAMAN LAKSHADWEEP HARBOUR WORKS
- >
NTID 47525881
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRenovation Of Firefighting Sys in Nicobar Island - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renovation Of Firefighting Sys" in Nicobar Island, India.
ANDAMAN LAKSHADWEEP HARBOUR WORKS
NTID 47525881
- Opening Date : Thu 10th December, 2026
- Closing Date : Wed 9th December, 2026
- ₹ 1922932.00
- NTID 47525881
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
38459.00 -
Document Cost
Refer Documents -
Estimated Cost
1922932.00
BOQ Items Total Items : 16 | Total Qty : 751.11
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Cutting and removing RCC/rich mix by using pavement breaker including cost of hire charges of pavement breaker and the work shall be carried out as per the direction of the EIC.The rates including cost of hire charges of pavement breaker or air comprssor with POL and operator all labour charges for breaking and stacking of unserviceableand serviceable materials, gas cutter & minor T&P, transportation of materials, GST, LWC, ..etc , complete. | 35 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding cost of centering and shuttering - All work upto plinth level.1:3:6 (1 cement, 3 pulverised stone sand and 4 grade stone aggregate 20mm nominal size).The work shall be carried out as per the direction of the EIC.. The rates including cost of cement, all other materials, all labour charges, materials, minor T&P, transportation of materials, GST, LWC, ..etc , complete. | 16 | Cum |
| 3 | Providing form work including centering shuttering so as to give rough finish strutting and propping etc. height of propping and centering below supporting floors to ceiling not exceeding 4m and removal of the same for in site reinforced concrete and plain concrete work in: (a) foundation footings bases of coloumns etc and mass concrete.The work shall be carried out as per the direction of the EIC.The rates including cost of all labour charges, all other materials, minor T&P, transportation of materials, GST, LWC, ..etc , complete. | 15 | Sqm |
| 4 | Providing and fixing Heavy Duty MS pipes conforming to IS 1239 (Part 1) Class 'C'of nominal bore 80 mm (3" dia) complete with fittings. The work shall be carried out as per the directions of the Engineer-in-Charge. The rate is including the cost of MS pipes and fittings, cutting, threading, welding/jointing, trenching and refilling, all labour, materials, T&P, transportation, LWC, GST, etc., complete. | 48 | Mtr. |
| 5 | Providing and fixing Heavy Duty MS pipes conforming to IS 1239 (Part 1) Class 'C' of nominal bore 100 mm (4" dia) complete with fittings. The work shall be carried out as per the directions of the Engineer-in-Charge. The rate is including the cost of MS pipes and fittings, cutting, threading, welding/jointing, trenching and refilling, all labour, materials, T&P, transportation, LWC, GST, etc., complete. | 302 | Mtr. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054