- Home
- >
- Tender
- >
- Delhi Tender
- >
- Department of Irrigation And Flood Control Department
- >
NTID 42914335
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRenovation Of Chhoti Chaupal A in Delhi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renovation Of Chhoti Chaupal A" in Delhi, India.
- Opening Date : Tue 2nd December, 2025
- Closing Date : Tue 2nd December, 2025
- ₹ 7853703.00
- NTID 42914335
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
157074.00 -
Document Cost
Refer Documents -
Estimated Cost
7853703.00
BOQ Items Total Items : 85 | Total Qty : 11508
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 247 | sqm |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.15.7.4 In cement mortar | 4 | Cum |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 8 | Cum |
| 4 | Kota stone slab flooring over 20 mm (average) thick base laid over and inted with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 25 mm thick | 217 | Sqm |
| 5 | Masonry work with C&D recycled cement concrete brick of size 230mm x110mm x75mm of grade M-10 in super structure above plinth level upto Level II with cement motar 1:6( 1 cement : 6 coarse sand). | 33 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054