Inquiry NowRenovation And Upgradation Of in Kolkata - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renovation And Upgradation Of " in Kolkata, India.
KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY
Kolkata, West Bengal, India
NTID 42749159
- Opening Date : Thu 4th December, 2025
- Closing Date : Mon 1st December, 2025
- ₹ 3649145.00
- NTID 42749159
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
72983.00 -
Document Cost
Refer Documents -
Estimated Cost
3649145.00
BOQ Items Total Items : 84 | Total Qty : 11715.52
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof. | 26.48 | Cu.m |
| 2 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. (a) upto 150 mm. thick | 20.00 | Cu.m |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches,levelling, dressing and ramming the bottom,bailing out water as required complete. a) Depth of excavation not exceeding 1,500 mm. | 72.00 | Cu.m |
| 4 | Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.( Payment to be made on the basis of measurement of finished quantity of work ) a) With earth obtained from excavation of foundation. | 45.13 | Cu.m |
| 5 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 50.00 | Cu.m |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054