- Home
- >
- Tender
- >
- Jammu and Kashmir Tender
- >
- Department of National Institute of Technology Srinagar
- >
NTID 45985875
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRenewing Macadamisation On Var in Srinagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renewing Macadamisation On Var" in Srinagar, India.
National Institute of Technology Srinagar
Srinagar, Jammu and Kashmir, India
NTID 45985875
- Opening Date : Tue 4th August, 2026
- Closing Date : Mon 3rd August, 2026
- ₹ 5990842.00
- NTID 45985875
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
119800.00 -
Document Cost
500.00 -
Estimated Cost
5990842.00
BOQ Items Total Items : 9 | Total Qty : 40272.53
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 34.16 | CUM |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 83.42 | CUM |
| 3 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material within all lifts and lead upto 1km (by mechanical means). | 6323.19 | SM |
| 4 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge. | 97.66 | CUM |
| 5 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom.On bituminous surface @ 0.25kg/sqm With rapid setting bitumen emulsionOn bituminous surface @ 0.25kg/sqm | 14691.25 | SM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054