Inquiry NowRenewal Work By Sdbc In Makku in Rudraprayag - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renewal Work By Sdbc In Makku " in Rudraprayag, India.
Public Works Department
Rudraprayag, Uttarakhand, India
NTID 44866037
- Opening Date : Wed 29th April, 2026
- Closing Date : Wed 29th April, 2026
- ₹ 8777188.00
- NTID 44866037
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
264000.00 -
Document Cost
4720.00 -
Estimated Cost
8777188.00
BOQ Items Total Items : 9 | Total Qty : 35410.42
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 By Mechanical Means | 69.65 | Cum |
| 2 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 21712.40 | Sqm |
| 3 | Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD with Bitumen VG-10 | 93.75 | Cum |
| 4 | Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects Grading II - 10mm using VG - 10 bitumen (bituminous binder @ 5 % of mix) | 542.81 | Cum |
| 5 | Interlocking Concrete Block Pavement Providing and Laying of Interlocking Concrete Block (M-35) Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. | 600.00 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054