- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED
- >
NTID 47463856
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRenewal Of Worn Out Hot Air Ga in METTURDAM - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renewal Of Worn Out Hot Air Ga" in METTURDAM, India.
TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED
METTURDAM, Tamil Nadu, India
NTID 47463856
- Opening Date : Fri 27th November, 2026
- Closing Date : Thu 26th November, 2026
- ₹ 0.00
- NTID 47463856
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
8500.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 12 | Total Qty : 292
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Charges for removing the damaged / worn out bunch of Haste alloy spring seal assemblies of frame top in the existing hot air gate plate entering top surface of duct, fixing the new bunch of SS seal assembly with proper setting & aligning the seals and additionally fixing the top side seals etc… Finally checking the Hot air gate smooth operation for ensuring the sliding gate piercing into the seal beam assembly for arresting of hot air gate leaks etc..(Required qty. of Asbestos ropes are under contractor scope). | 4 | Nos |
| 2 | Charges for removing the all inspection doors of hot air gate side walls, removing the damaged / worn out bunch of Haste alloy seal assembly from the existing hot air sliding gate seating duct side walls & bottom walls, fixing the new Haste alloy seal assembly of duct frame left vertical & right vertical side seals, Frame bottom seals with proper setting & aligning the seals and additionally fixing the frame vertical & bottom side seals etc… Finally checking the Hot air gate smooth operation for ensuring the sliding gate piercing into the seal beam assembly for arresting of hot air gate leaks etc. (Required qty. of Asbestos ropes are under contractor scope ). | 4 | Nos |
| 3 | Charges for dismantling the pneumatic operated power cylinder from the hot air gate & lower down to the mill repair bay, remove the end caps, piston shaft with flange, lock nut etc… one by one, cleaning, checking and inspecting the piston seals, ‘o’ rings & renewal of worn out parts etc… if necessary, reassembling to the hot air gate body and checking the trouble free operation of hot air gate movement etc... More care to be taken while renewal of seals in Hot air gate cylinder. If damaged, free replacement shall be made at free of cost. (Portable type air compressor for checking the cylinder & gate operation (8 kg. pressure) is to be provided by contractors if necessary to complete the work within time as service air will not be available during Unit overhauling period). | 4 | Nos |
| 4 | Charges for cutting and removing the wornout seal holding plates of size 1700x150mm in the hot air duct and refixing the new MS plate of the required size after assembling the hot air duct SS seals including cost of consuables and T&Ps etc., (required 10mm tk MS plates contractor's scope) | 4 | Nos |
| 5 | Hot PA shut off gate cylinder seals | 4 | sets |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054