- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of Public Works Department
- >
NTID 47257559
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRenewal Of Dedicated Internet in CALCUTTA - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renewal Of Dedicated Internet " in CALCUTTA, India.
Public Works Department
CALCUTTA, West Bengal, India
NTID 47257559
- Opening Date : Fri 20th November, 2026
- Closing Date : Wed 18th November, 2026
- ₹ 0.00
- NTID 47257559
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
20100.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 7 | Total Qty : 3
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Renewal of 1500-MB/s (1:1) Dedicated Internet Leased Line Connectivity (BackUp Feed) including all accessories and minimum 5 Public IPs. [Location: P.W.Dte. Data Center, at Ground Floor, Main Block, Writers Building, Kolkata - 700 001] Interface Required: Ethernet Media: Through Single-Mode Optical Fiber Cable (OFC) or RF and which will be Owned by Service Provider] [DILL Condition: Throughput: 100% Non – blocking (after Firewall); Packet Drop: < 0.5 %; Network Uptime: > 99.5 %; RTD: Less than 300 ms; MRTG: Online] | ||
| 2 | One time installation charge including Integration charges with the Existing Infrastructure of One fully dedicated and seperate (includnig all used component) line with Single Mode OFC Media only and should be laid through Aerial/Underground outside & suitable fire retardant conduit inside the building premises as per direction engineer-in-charge. Service provider must have a Underground ISP Laynig Backbone at Kolkata and necessary certificate / undertaking has to provide. Minimum Accessories Required to Complete the Installation as per site requirement: a) Last-mile connectivity should be optical fiber cable only and handshaking will be done by OFC SFP Module only. Accessories including MUX, Router, Network Switchs or other accessories required as per site requirement and will be considered as one time supply. Any Asset Recovery is subject to the availability of permission from the concerned Govt. Authority or End User. PWD authority will not take any responsibility of Any Asset Recovery. [excluding Shared Internet Leased Line Service (SILL) and GPON (Gigabit Passive Optical Network) Technology Network] | ||
| 3 | Recurring charges including Internet bandwidth charges, or other configuration and interfacing charges etc for 01(One) Year. | 1 | Rate per Year |
| 4 | Renewal of 1-GBps (1:1) Dedicated Point to Point Leased Line Connectivity (BackUp Feed) including all accessories. [Point-A Location: P.W.Dte. IT Data Center, at Ground Floor, Main Block, Writers Building, Kolkata - 700 001] [Point-B Location: P.W.Dte. IT Server Room, 2nd Floor, KIT Building / 5th Floor, KIT Annexe Building; P-16, India Exchange Place (Extn.); Kolkata - 700 087] Interface Required: Ethernet Media: Through Single-Mode Optical Fiber Cable (OFC) or RF and which will be Owned by Service Provider] [DILL Condition: Throughput: 100% Non – blocking (after Firewall); Packet Drop: < 0.5 %; Network Uptime: > 99.5 %; RTD: Less than 300 ms; MRTG: Online] | ||
| 5 | One time installation charge including Integration charges with the Existing Infrastructure of One fully dedicated and seperate (includnig all used component) line with Single Mode OFC Media only and should be laid through Aerial/Underground outside & suitable fire retardant conduit inside the building premises as per direction engineer-in-charge. Service provider must have a Underground ISP Laynig Backbone at Kolkata and necessary certificate / undertaking has to provide. Accessories Required as per site requirement: a) a) Last-mile connectivity should be optical fiber cable only and handshaking will be done by OFC SFP Module only. Accessories including MUX, Router, Network Switchs or other accessories required as per site requirement and will be considered as one time supply. Any Asset Recovery is subject to the availability of permission from the concerned Govt. Authority or End User. PWD authority will not take any responsibility of Any Asset Recovery. [excluding Shared Internet Leased Line Service (SILL) and GPON (Gigabit Passive Optical Network) Technology Network] |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054