- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of URBAN DEVELOPMENT DEPARTMENT
- >
NTID 46659253
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRejuvenation And Beautificatio in Giridh - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Rejuvenation And Beautificatio" in Giridh, India.
- Opening Date : Fri 25th September, 2026
- Closing Date : Thu 24th September, 2026
- ₹ 13429500.00
- NTID 46659253
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
268590.00 -
Document Cost
10000.00 -
Estimated Cost
13429500.00
BOQ Items Total Items : 196 | Total Qty : 23481.96
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Item Description1 | ||
| 2 | Earth work in foundation trenches and plinth in layer not exceeding 150mm thick will watered, rammed, fully compacted and fine dressed with earth obtained after cutting within a lead of 50M and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 3009.39 | M3 |
| 3 | Extra for earth work in hard soil as per specification & direction of E/I.(Vide classification of soil item - B | 1012.58 | M3 |
| 4 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched wiith a lead of 50mm and lift of 1.5M all complete as per bulding specification and direction of E/I. | 55.26 | M3 |
| 5 | Filling in foundation trenches and plinth in layers. Not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume) Qty same as item no.1 . | 100 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054