Inquiry NowRehabilitation Of Selvanur Tan in Ramanathapuram - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Rehabilitation Of Selvanur Tan" in Ramanathapuram, India.
WATER RESOURCES DEPARTMENT
Ramanathapuram, Tamil Nadu, India
NTID 44252080
- Opening Date : Wed 4th March, 2026
- Closing Date : Tue 3rd March, 2026
- ₹ 25418060.00
- NTID 44252080
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
138000.00 -
Document Cost
Refer Documents -
Estimated Cost
25418060.00
BOQ Items Total Items : 26 | Total Qty : 222225.43
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing Juliflora jungle without uprooting and disposing off the same complete complying with standard specification and as directed by the Engineer in charge of work. | 138318.00 | Sqm |
| 2 | Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 metre by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deployed , and not exceeding 23 cm thickness, benching of slopes prior to placement of earth fill, including extra earth filling , breaking clods, watering to OMC and compaction of each layer to 95% of Proctor density through deployment of appropriate compaction equipment 8-10 tonne power roller; vibratory power roller; short width (+/-)0.90m width drum) power roller or vibratory power roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes through the deployment of hydraulic excavators with steel plate fixtures attached to their booms/ heavy power rollers capable of climbing 2.00 (Horizontal) : 1.00 (Vertical) slope including side slopes complete complying with technical specification and as directed by the Engineer in charge of work. | 76160.00 | Cum |
| 3 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc, complete complying with standard specification and as directed by the Engineer in charge of work.(SS.20B) | 2120.30 | Cum |
| 4 | Dismantling with out damaging the near by structures if any, clearing away and carefully stacking materials useful for reuse for any thickness of walls in brick/stone masonry in cement mortar wall under 3 m high etc, complete complying with technical specification and as directed by the Engineer in charge of work | 193.50 | Cum |
| 5 | Dismantling with out damaging the near by structures if any, clearing away and carefully stacking materials useful for reuse for any thickness of plain cement concrete etc, complete complying with technical specification and as directed by the Engineer in charge of work | 188.40 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054