- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of GOVERNMENT OF JHARKHAND
- >
NTID 44411089
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowReconstruction Work Of Paralle in Deoghar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Reconstruction Work Of Paralle" in Deoghar, India.
- Opening Date : Thu 2nd April, 2026
- Closing Date : Tue 31st March, 2026
- ₹ 40039249.00
- NTID 44411089
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
401000.00 -
Document Cost
10000.00 -
Estimated Cost
40039249.00
BOQ Items Total Items : 45 | Total Qty : 38037.303
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) | 1.140 | Hec. |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately (i) Granular Course by Mechanical means | 65.250 | Cum |
| 3 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately (i) Bitumnous Course byMechanical means | 15.400 | Cum |
| 4 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m(A) Ordinary Soil | 2698.690 | Cum |
| 5 | Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | 7120.790 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054