- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Greater Noida Industrial Development Authority
- >
NTID 45128214
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRaising Of Cc Road And Drain W in Gautam Budnagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Raising Of Cc Road And Drain W" in Gautam Budnagar, India.
Greater Noida Industrial Development Authority
Gautam Budnagar, Uttar Pradesh, India
NTID 45128214
- Opening Date : Wed 20th May, 2026
- Closing Date : Mon 18th May, 2026
- ₹ 5824704.00
- NTID 45128214
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
117000.00 -
Document Cost
1770.00 -
Estimated Cost
5824704.00
BOQ Items Total Items : 20 | Total Qty : 5422.07
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Raising manhole cover and frame slab to required level including dismantling existing slab and making good the damage as required (Raising depth of manhole to be paid separately) :(DSR-18/19.26) | ||
| 2 | Circular manhole 140 cm dia with circular cover 600 mm dia of grade EHD - 35 (DSR-18/19.26.4) | 20.0000 | Each |
| 3 | Providing and fixing in position pre-cast R.C.C. manhole cover and frame of required shape and approved quality EHD - 35: Circular shape 560 mm internal dia (DSR-18/19.19.4.1) | 12.0000 | Each |
| 4 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transportig to the embankment location within all lifts and lead upt 1000m (MORTH-20/3.06/301) | 519.7500 | Cum |
| 5 | Cement concrete with 4cm gauge Approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054