- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Military Engineer Services
- >
NTID 44697543
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowProvn Of Cooling Towers For Ce in Bareilly - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Provn Of Cooling Towers For Ce" in Bareilly, India.
Military Engineer Services
Bareilly, Uttar Pradesh, India
NTID 44697543
- Opening Date : Mon 27th April, 2026
- Closing Date : Sat 18th April, 2026
- ₹ 4400000.00
- NTID 44697543
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
88000.00 -
Document Cost
500.00 -
Estimated Cost
4400000.00
BOQ Items Total Items : 33 | Total Qty : 989.11
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 70 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 2.00 | Each Job |
| 2 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 125 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 1.00 | Each Job |
| 3 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 60 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 1.00 | Each Job |
| 4 | Supply fixing installation and testing complete a new Cooling Tower of Capacity 50 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 1.00 | Each Job |
| 5 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 90 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. Note FOR Item 1 to 5 : (i) Rates are inclusive of all minor/Major parts complete set of Cooling Tower. (ii) Size and capacity of Cooling Tower will be as per mentioned above (iii) LPS/PVC Fills rates are included in quoted rates. (iv) Tie Rod/Turn Buckle SS/Eliminators/Fan Assembly with motor etc complete set with all connected items. | 1.00 | Each Job |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054