Inquiry NowProvn Of Certain Sanction Work in Kalaikunda - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Provn Of Certain Sanction Work" in Kalaikunda, India.
Military Engineer Services
Kalaikunda, West Bengal, India
NTID 43823511
- Opening Date : Thu 26th February, 2026
- Closing Date : Tue 24th February, 2026
- ₹ 2684000.00
- NTID 43823511
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
53700.00 -
Document Cost
500.00 -
Estimated Cost
2684000.00
BOQ Items Total Items : 44 | Total Qty : 4693.45
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation in trenches / post holes in Soft/ loose soil not exceeding 1.5 mtr wide and not exceeding 1.5 meter in depth for taking out and laying pipe lines not exceeding 10 Sqm on plan and getting out, excavated earth, forming bottom surfaces to required level.Complete all as specified and as directed. | 70.20 | Cum |
| 2 | Excavation in trenches n exc 1.5 wide and n exc 1.5 m in depth for foundation etc or for laying cable etc n exc 10 Sqm on plan and n exc 1.5 m in depth and getting out in hard/dense soil complete all as specified and directed. | 244.00 | Cum |
| 3 | Removing excavated material (soil) not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point.Complete all as specified and as directed. | 159.10 | Cum |
| 4 | Returning filling in including spreading leveling watering and well ramming in layers n.exc 25cm thick in soft/loose soil.Complete all as specified and as directed. | 155.10 | Cum |
| 5 | Material and labour for sand cushioning for U/G cable 8 cm before laying the cable and 15cm after laying and stretching the cable Complete all as specified and as directed. | 80.06 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054