- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Orissa Mining Corporation Limited
- >
NTID 42791243
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowProvision Of Rcc Pedestal For in Jajpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Provision Of Rcc Pedestal For " in Jajpur, India.
- Opening Date : Fri 5th December, 2025
- Closing Date : Thu 4th December, 2025
- ₹ 2193000.00
- NTID 42791243
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
21937.00 -
Document Cost
7080.00 -
Estimated Cost
2193000.00
BOQ Items Total Items : 5 | Total Qty : 388.7
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders (except sheet rocks and boulders requiring for blasting) including dressing and leveling the bed up to the required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P shoring and shuttering and dewatering if required etc. comp. as directed by EIC. | 153.00 | Cum |
| 2 | Filling foundation and plinth with river sand, well watered, rammed including cost, conveyance, royalties of materials, cost of all labour and T&P required for the work etc. complete as per direction of EIC. | 33.80 | Cum |
| 3 | P.C.C. of prop. (1:3:6) in foundation using 4 cm. size broken hard granite metal of approved quality from appd. quarry including lowering, laying concrete to required levels laid in layers not exceeding 150mm thick including cost, conveyance, royalties of all materials, watering and curing and cost of all labour, T&P required for the work etc. comp as per direction of EIC. | 33.90 | Cum |
| 4 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost,conveyance,royalities of all material, dismantling the centering, shuttering work after the period as specified by EIC and cost of all labour,T &P required for the work complete in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. | 160.00 | Cum |
| 5 | Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost, conveyance of HYSD bars Fe500 and binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC.(Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire, overlap, chairs will not be considered for measurement) | 8.00 | ton |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054