- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of Military Engineer Services
- >
NTID 44196763
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowProvision Of Or Institute At A in KAMPTEE - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Provision Of Or Institute At A" in KAMPTEE, India.
Military Engineer Services
KAMPTEE, Maharashtra, India
NTID 44196763
- Opening Date : Thu 12th March, 2026
- Closing Date : Tue 10th March, 2026
- ₹ 4417000.00
- NTID 44196763
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
88340.00 -
Document Cost
500.00 -
Estimated Cost
4417000.00
BOQ Items Total Items : 77 | Total Qty : 14211.3
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Surface excavation n.exc(not exceeding) 30 cm deep and averaging 15cm deep and getting out in any type of soil complete all as specified and as directed. | 326.40 | Sqm |
| 2 | Excavation in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and exc 1.5 m in depth; and getting out in any kind of soil complete all as specified and as directed. | 92.40 | Cum |
| 3 | Excavation in trenches, exc 1.5 m wide and exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and exc 1.5 m in depth and getting out in any kind of soil complete all as specified and as directed. | 21.56 | Cum |
| 4 | Material and labour for providing plain cement concrete 1:4:8 type D2 (Using 40mm graded stone aggregate) in foundation, mass concrete and filiings, complete all as specified and directed. | 9.91 | Cum |
| 5 | Material and labour for Use and waste of formwork to sides of concrete foundations including rafts, footings, foundation beams, plinth beams, bases for columns etc. for fair finished surface of concrete,all as specified & directed. | 195.21 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054