Inquiry NowProvision Of Entry-exit Gate A in Kolkata - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Provision Of Entry-exit Gate A" in Kolkata, India.
THE DURGAPUR PROJECTS LIMITED
Kolkata, West Bengal, India
NTID 46004557
- Opening Date : Thu 6th August, 2026
- Closing Date : Fri 31st July, 2026
- ₹ 0.00
- NTID 46004557
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2200.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 18 | Total Qty : 213.89
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Surface Dressing of the ground inany kind of soil including removing vegetation inequalities not exceeding15cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 20 | Sqm |
| 2 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. | 1 | Cum |
| 3 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof.(a) upto 150 mm. thick. | 1 | Cum |
| 4 | Dismantling of M.S. Structure and Labour for lowering and stacking after dismantling in parts R.S. joists, channels, angles, tees, plates etc.complete as directed. | 5 | Qntl. |
| 5 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 3 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054