Inquiry NowProviding Sheet Roof Over The in Thiruvananthapuram - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Providing Sheet Roof Over The " in Thiruvananthapuram, India.
Kerala State Nirmithi Kendra
Thiruvananthapuram, Kerala, India
NTID 42831915
- Opening Date : Sat 29th November, 2025
- Closing Date : Thu 27th November, 2025
- ₹ 4394402.00
- NTID 42831915
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
50000.00 -
Document Cost
2500.00 -
Estimated Cost
4394402.00
BOQ Items Total Items : 33 | Total Qty : 14156.42
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Providing sheet roof over the open Terrace of Dinning hall | ||
| 2 | 24.2Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works | 70.000 | sqm |
| 3 | 5.9.6Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 14.400 | sqm |
| 4 | 4.1.2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1 :3 (1 Cement: 1 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.080 | cum |
| 5 | 10.16.1Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 4887.964 | kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054