Tender for Indian Rare Earths Limited - NTID 35814992
Indian Rare Earths Limited
Ganjam, Odisha, India
NTID 35814992
- Opening Date : Tue 30th November, -0001
- Closing Date : Sat 30th March, 2024
- ₹ 6855521.00
- NTID 35814992
Providing Of Repair And Maintenance Of Plant/ Systems/equipments - Industry Unit; As Per Scope Of Work; As Per Scope Of Work - Laying, Dressing, Termination, Ferruling Of Instrument Cable (power / Signal) On Cable Tray / Supports. Including & Up To 2.5 Sq Mm 7 Core , Laying, Dressing, Termination, Ferruling Of Instrument Cable (power /signal) On Cable Tray / Supports. Above 7 Core & Up To 2.5 Sq. Mm 24 Core. , Fixing / Replacement Of Instrument Cable Tray (gi / Frp) Withnecessary Support Works. This Includes Bends, Coupler Plates, Suitable Fasteners & Welding, Cutting Of Supports / Ms Angles, Fixing On Walls Etc. As Directed By Eic. Size — 50 To 200 Mm, Perforated Type,300 To 600 Mm, Ladder / Perforated Type. , Fabrication Of M.s. Pipes / Cs Pipes (seamless)/hdpe With Necessary Jointing System With Flange, Nipple, Distribution Header Etc. This Includes Fixing The Pipeline Sizes As Mentioned Including Cutting, Joint Welding 15 To 100 Nb With 2 Coat Epoxy Paint. , Fabrication Of Frames/structural Support/roof/cover For Installationof Instruments .this Includes Welding, Cutting Of Supports / Ms Angles, Fixing On Walls. With 2 Coat Epoxy Paint. , Fixing/replacement/handling Of Instrument Control Valve And Wiring And Testing .size 15 To 150 Mm Flanged/threaded Type. , Fixing/replacement/handling Of Instrument Flow Meter And Wiring And Testing .size 15 To 150 Mm Flanged/threaded Type. , Fixing/replacement/handling Of Instrument Level Sensor And Wiring And Testing .size 15 To 80 Mm Flanged/threaded Type. , Fixing/replacement/handling Of Instrument Pressure Transmitter/ Guages And Wiring And Testing .size 15 To 80 Mm Flanged /threaded Type. , Fixing/replacement/handling Of Instrument Rtd/thermocouple /thermowell, Wiring And Testing .size 300 To 2500 Mm Length Flanged /threaded Ape. , Fixing/replacement/handling Of Digital Panel Meter/pid Controller/transmitter And Wiring And Testing .size 15 To 80 Mm Flanged /threaded Type. , Fixing/replacement/handling Of Solenoid Valve/pneumatic Cylinder And Wiring And Testing Flanged /threaded Type. , Repair And Testing Of Instrument Control Valve.size 15 To 150 Mm Flanged /threaded Type. , Repair And Testing Of Instrument Flow Meter.size 15 To 150 Mm Flanged /threaded Type. , Repair And Testing Of Instrument Level Sensor. Size 15 To 80 Mm Flanged /threaded Type. , Repair And Testing Of Instrument Pressure Transmitter/guages .size 15 To 80 Mm Flanged /threaded Type. , Repair And Testing Of Instrument Rtd/thermocouple/ Thermowell.size 300 To 2500 Mm Length Flanged /threaded Type. , Repair And Testing Of Digital Panel Meter/pid Controller/transmitter Size 15 To 80 Mm Flanged /threaded Ripe. , Repair And Testing Of Solenoid Valve/pneumatic Cylinder And Wiring And Testing Flanged /threaded Type. , Maintenance Of Ups 6 Kva: Blowering And Cleaning, Dedusting Of Ups. Checking Voltageand Earthing And Terminal Tightness Of Each Components I.e Mcb,i/o Terminals, Fuse Etc. Checking The Voltage Restoring The Normal Working Condition. Maintenance Work To Be Carried Out As Per Direction Of Eic , Maintenance Of Ups 20 Kva: Blowering And Cleaning, Dedusting Of No.s Ups. Check Ing Voltage And Earthing And Terminal Tightness Of Each Components I.e Mcb, L/o Terminals,fuse Etc. Checking The Voltage Restoring The Normal Working Condition. Maintenance Work To Be Carried Out As Per Direction Of Eic , Maintenance Of Battery 92 Nos: Blowering And Cleaning, Dedusting No.s Of Ups. Checking Voltage And Earthing And Terminal Tightness Of Each Components I.e Mcb,i/0 Terminals, Fuse Etc. Check The Voltage Of The Each Battery With Final Output Reading .replacing The Faulty Component Like Mcb,i/0 Terminals, Fuse,battery. Checking The Voltage Restoring The Normal Working Condition. Maintenance Work To Be Carried Out As Per Direction Of Eu. , Maintenance Of Plc: Blowering And Cleaning Dedusting Of Plc.checking Voltage And Earthing And Terminal Tightness Of Each Components I.e. Mcb,i/o Terminals,fuse,plc Modules, I/o Modules. Repair/rep\acing The Faulty Component Like Mcb,i/0 Terminals,fuse,plc Modules, L/o Modules/ Wiring. Maintenance Work To Be Carried Out As Per Direction Of Eic , Maintenance Of Compressor: Blowering And Cleaning,dedusting, Lubrication Of Cylinder, Blow Down Etc .checking Voltage And Earthing And Terminal Tightness Of Components I.e Mcb,terminais,fuse ,etc. Repair/replacing The Faulty Component Like Mcb,i/o Terminals,fuse, Controller Etc. Checking The Voltage Restoring The Normal Condition. Maintenance Work To Be Carried Out As Per Direction Of Eic. , Maintenance Of Dryer: Blowering And Cieaning,dedusting Of Dryer, Lubrication Of Cylinder, Blow Down Etc .checking Voltage And Earthing And Terminal Tightness Of Dryer Components I.e Mcb,terminals, Fuse, Etc.repair/replacing The Faulty Component Like Mcb, L/o Terminals, Fuse, Etc. Checking The Voltage Restoring The Normal Working Condition. Maintenance Work To Be Carried Out As Per Direction Of Eic. , Preventive & Maintenance Of Instrument Control Valves: Blowering And Cleaning, Dedusting/covering And Lubrication Of Control Valve, Check The Supply/signal 4- 20ma .checking The Operation Of The Control Valve And Also Operation From The Control Room. Maintenance Work To Be Carried Out As Per Direction Of Eic. , Preventive & Maintenance Of Flowmeter With Transmitter. Blowering And Cleaning, Dedusting/covering And Terminal Tightness, Check The Supply/ Signal 4-20ma .checking The Operation And Also Operation From The Control Room.maintenance Work To Be Carried Out As Per Direction Of Eic. , Preventive & Maintenance Of Level Sensor/switch With Transmitter: Blowering And Cleaning, Dedusting/covering And Terminal Tightness, Check The Supply/signal 4-20ma.checking The Operation And Also Operation From The Control Room. Maintenance Work To Be Carried Out As Per Direction Of Eic. , Preventive & Maintenance Of Solenoid Valve/pneumatic Cylinder: Blowering And Cleaning, Dedusting/covering And Terminal Tightness, Check The Supply/signal 4-20ma .checking The Operation And Also Operation From The Control Room. Maintenance Work To Be Carried Out As Per Direction Of Eic. , Preventive & Maintenance Of Pressure Gauge/pressure Transmitter: Blowering And Cleaning, Dedusting/covering And Terminal Tightness, Check The Supply/signal 4-20ma .checking The Operation And Also Operation From The Control Room. Maintenance Work To Be Carried Out As Per Direction Of Eic. , Preventive & Maintenance Of Digital Panel Meter/timer/pidcontroller/ Lip: Blowering And Cleaning, Dedusting/covering And Terminal Tightness, Check The Supply/signal 4-20ma .checking The Operation And Also Operation From The Control Room. Maintenance Work To Be Carried Out As Per Direction Of Eic. , Preventive & Maintenance Of Ash Handling System: Blowering And Cleaning, Dedusting/covering And Terminal Tightness, Check The Supply/ Signal 4-20ma .checking The Operation And Also Operation From The Control Room.maintenance Work To Be Carried Out As Per Direction Of Eic , Preventive & Maintenance Of Tsp Bagging System: Blowering And Cleaning, Dedusting/covering And Terminal Tightness, Check The Supply/signal 4-20ma/calibration With Test Weight .checking The Operation. Maintenance Work To Be Carried Out As Per Direction Of Eic. , Preventive & Maintenance Of Ball Mill Weigh Machine: Blowering And Cleaning, Dedusting/covering And Terminal Tightness, Check The Supply/signal 4-20ma/calibration With Test Weight .checking The Operation. Maintenance Work To Be Carried Out As Per Direction Of Eic. , Preventive & Maintenance Of Boiler Belt Weigher: Blowering And Cleaning, Dedusting/covering And Terminal Tightness, Check The Supply/signal 4-20ma/calibration With Test Weight .checking The Operation. Maintenance Work To Be Carried Out As Per Direction Of Eic , Preventive & Maintenance Of Rechloride Bagging System Blowering And Cleaning, Dedusting/covering And Terminal Tightness, Check The S Upply/signal 4-20ma/calibration With Test Weight Checking The Operation. Maintenance Work To Be Carried Out As Per Direction Of Eic. , Fixing/replacement/testing And Calibration/dedusting/ Cleaning/covering/wiring Of Belt Weigher/weighing Machine/load Cell With Standard Weight/standard Chain. Maintenance Work To Be Carried Out As Per Direction Of Eic , Fixing/rep!acement/testing/dedusting/cieaning/covering/wiring Of Fire Alarm System/cctv Camera. Maintenance Work To Be Carried Out As Per Direction Of Eic
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
116195.00 -
Document Cost
Refer Documents -
Estimated Cost
6855521.00
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane