- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of Pimpri Chinchwad Municipal Corporation
- >
NTID 47222782
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowProviding Comprehensive Monthl in Pune - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Providing Comprehensive Monthl" in Pune, India.
Pimpri Chinchwad Municipal Corporation
Pune, Maharashtra, India
NTID 47222782
- Opening Date : Tue 3rd November, 2026
- Closing Date : Mon 2nd November, 2026
- ₹ 0.00
- NTID 47222782
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
Refer Documents -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 5 | Total Qty : 4
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | PART 1 | ||
| 2 | Annual Comprehensive maintenance Contract Of Passenger Lift ( Johnsons) make : 1) Includes the Greasing, Oiling, Cleaning and rep air/replace of all required parts for upto 8 passengers Lift for Basment 1/ Basment -2 / Ground Floor / 1st Floor / 2nd Floor Avg Height of floor is 4meter. Monthly Inspection Report shall submitted to PCMC. 2) Machine Detail- 3Ph, 50Hz, 380-415V 4.1kw motor, Rated Speed-1.25m/sec. 3) Opening with power operated one opening door. Drive- gear less AC type Drive), Sensor- Beam Type .4) Location of machine room above Lift shaft. 5) Operation is microprocessor based, Control Drive- Frenic, Type-FRN5.5E1S-4A . 6) Car-Car having MS sheet of 18 gauge hairline finish with safety factor of 5 floors position indicator at all landing with all required material and labours for maintenance and repairing work of Lift one visit per month and unlimited breakdown visits when required complete.Types of contract: - COMPREHENSIVE. Scope of our work :- 1. Make minor adjustment so as to keep lift and its installation in good working condition. 2.Technician will examine and service lift on monthly basis with prior information to us. 3. Clean the machine, motor and controller. 4. Clean the lubricate hoist way equipment and entrances and collapsible door. 5. Grease and oil bearings and guides. 6. Conduct an annual equipments survey. 7. Conduct and annual safety survey. 8. Provide lubricating oils, greases and cleaning materials. 9. Maintaining record of services given. 10. Force majorclause is applicable. 11. Attend breakdown call as when they arise. 12. Emergency services will be provide 24 hours. PARTS REPAIR / REPLACED FREE OF COST :- 1. Electrical :- Preventer, Fan Switch, Diodes, Limit Switch , Resistance, Relay , Bottle Fuse, Alarm, Simple Buzzer Horn. 2. Mechanical Part :- Lock Spares, Ram Rubber, Door Bearing, Gibbs, Door Stopper, Door Handles, Tube Acrylic, OSG Roller, Nut Bolt, Magnet with brush, motor oil, Grease, Ram Spring, Door Up Track Biscuits, Ram Rope, Door damage, door lock full set, main pulley, diverler pully, main contactors, over load really, brake coil, gear oil, single phase motor, motor couple, gear, over speed covernor pulley, OSG rope, main rope, break liner break unit, traveling cable, push buttons set, plat form, cabin damages and any accidental damage, fan, tube light, and switch. | 1 | Job per Month |
| 3 | Annual Comprehensive maintenance Contract Of Passenger Lift ( Johnsons) make : 1) Includes the Greasing, Oiling, Cleaning and rep air/replace of all required parts for upto 5 passengers Ground Floor / 1st Floor / 2nd Floor /3 FloorAvg Height of floor is 4 meter. Monthly Inspection Report shall submitted to PCMC. 2) Machine Detail- 3Ph, 50Hz, 380-415V 3.5 kw motor, Rated Speed-1.25m/sec. 3) Opening with power operated side opening door. Drive-Gear less Ac Drive), Sensor- Beam Type .4) Location of machine room above Lift shaft. 5) Operation is microprocessor based, Control Drive- Frenic, Type-FRN5.5E1S-4A . 6) Car-Car having MS sheet of 18 gauge hairline finish with safety factor of 3 floors position indicator at all landing with all required material and labours for maintenance and repairing work of Lift one visit per month and unlimited breakdown visits when required complete.Types of contract: - COMPREHENSIVE. Scope of our work :- 1. Make minor adjustment so as to keep lift and its installation in good working condition. 2.Technician will examine and service lift on monthly basis with prior information to us. 3. Clean the machine, motor and controller. 4. Clean the lubricate hoist way equipment and entrances and collapsible door. 5. Grease and oil bearings and guides. 6. Conduct an annual equipments survey. 7. Conduct and annual safety survey. 8. Provide lubricating oils, greases and cleaning materials. 9. Maintaining record of services given. 10. Force majorclause is applicable. 11. Attend breakdown call as when they arise. 12. Emergency services will be provide 24 hours. PARTS REPAIR / REPLACED FREE OF COST :- 1. Electrical :- Preventer, Fan Switch, Diodes, Limit Switch , Resistance, Relay , Bottle Fuse, Alarm, Simple Buzzer Horn. 2. Mechanical Part :- Lock Spares, Ram Rubber, Door Bearing, Gibbs, Door Stopper, Door Handles, Tube Acrylic, OSG Roller, Nut Bolt, Magnet with brush, motor oil, Grease, Ram Spring, Door Up Track Biscuits, Ram Rope, Door damage, door lock full set, main pulley, diverler pully, main contactors, over load really, brake coil, gear oil, single phase motor, motor couple, gear, over speed covernor pulley, OSG rope, main rope, break liner break unit, traveling cable, push buttons set, plat form, cabin damages and any accidental damage, fan, tube light, and switch. | 1 | Job per Month |
| 4 | Annual Comprehensive maintenance Contract Of Passenger Lift ( Schindler ) make : 1) Includes the Greasing, Oiling, Cleaning and rep air/replace of all required parts for upto 10 passengers Ground Floor & upto 5th Floor ( Total Stops 6 ) Floor Avg Height of floor is 4 meter. Monthly Inspection Report shall submitted to PCMC. 2) Machine Detail- 3Ph, 50Hz, 380-415V 5 kw motor, Rated Speed-1.00m/sec. 3) Opening with power operated One side opening door. Drive-Gear less Ac Drive, Sensor- Beam Type .4) Location of machine room above Lift shaft. 5) Operation is microprocessor based, Control Drive- Frenic, Type-FRN5.5E1S-4A . 6) Car-Car having MS sheet of 18 gauge hairline finish with safety factor of 3 floors position indicator at all landing with all required material and labours for maintenance and repairing work of Lift one visit per month and unlimited breakdown visits when required complete.Types of contract: - COMPREHENSIVE. Scope of our work :- 1. Make minor adjustment so as to keep lift and its installation in good working condition. 2.Technician will examine and service lift on monthly basis with prior information to us. 3. Clean the machine, motor and controller. 4. Clean the lubricate hoist way equipment and entrances and collapsible door. 5. Grease and oil bearings and guides. 6. Conduct an annual equipments survey. 7. Conduct and annual safety survey. 8. Provide lubricating oils, greases and cleaning materials. 9. Maintaining record of services given. 10. Force majorclause is applicable. 11. Attend breakdown call as when they arise. 12. Emergency services will be provide 24 hours. PARTS REPAIR / REPLACED FREE OF COST :- 1. Electrical :- Preventer, Fan Switch, Diodes, Limit Switch , Resistance, Relay , Bottle Fuse, Alarm, Simple Buzzer Horn. 2. Mechanical Part :- Lock Spares, Ram Rubber, Door Bearing, Gibbs, Door Stopper, Door Handles, Tube Acrylic, OSG Roller, Nut Bolt, Magnet with brush, motor oil, Grease, Ram Spring, Door Up Track Biscuits, Ram Rope, Door damage, door lock full set, main pulley, diverler pully, main contactors, over load really, brake coil, gear oil, single phase motor, motor couple, gear, over speed covernor pulley, OSG rope, main rope, break liner break unit, traveling cable, push buttons set, plat form, cabin damages and any accidental damage, fan, tube light, and switch. | 1 | Job per Month |
| 5 | Annual Comprehensive maintenance Contract Of Passenger Lift ( Otice ) make : 1) Includes the Greasing, Oiling, Cleaning and rep air/replace of all required parts for upto 8 passengers Ground Floor & upto 5th Floor ( Total Stops 5 ) FloorAvg Height of floor is 4 meter. Monthly Inspection Report shall submitted to PCMC. 2) Machine Detail- 3Ph, 50Hz, 380-415V 3.5 kw motor, Rated Speed-1.00m/sec. 3) Opening with power operated side opening door. Drive-Gear less Ac Drive), Sensor- Beam Type .4) Location of machine room above Lift shaft. 5) Operation is microprocessor based, Control Drive- Frenic, Type-FRN5.5E1S-4A . 6) Car-Car having MS sheet of 18 gauge hairline finish with safety factor of 3 floors position indicator at all landing with all required material and labours for maintenance and repairing work of Lift one visit per month and unlimited breakdown visits when required complete.Types of contract: - COMPREHENSIVE. Scope of our work :- 1. Make minor adjustment so as to keep lift and its installation in good working condition. 2.Technician will examine and service lift on monthly basis with prior information to us. 3. Clean the machine, motor and controller. 4. Clean the lubricate hoist way equipment and entrances and collapsible door. 5. Grease and oil bearings and guides. 6. Conduct an annual equipments survey. 7. Conduct and annual safety survey. 8. Provide lubricating oils, greases and cleaning materials. 9. Maintaining record of services given. 10. Force majorclause is applicable. 11. Attend breakdown call as when they arise. 12. Emergency services will be provide 24 hours. PARTS REPAIR / REPLACED FREE OF COST :- 1. Electrical :- Preventer, Fan Switch, Diodes, Limit Switch , Resistance, Relay , Bottle Fuse, Alarm, Simple Buzzer Horn. 2. Mechanical Part :- Lock Spares, Ram Rubber, Door Bearing, Gibbs, Door Stopper, Door Handles, Tube Acrylic, OSG Roller, Nut Bolt, Magnet with brush, motor oil, Grease, Ram Spring, Door Up Track Biscuits, Ram Rope, Door damage, door lock full set, main pulley, diverler pully, main contactors, over load really, brake coil, gear oil, single phase motor, motor couple, gear, over speed covernor pulley, OSG rope, main rope, break liner break unit, traveling cable, push buttons set, plat form, cabin damages and any accidental damage, fan, tube light, and switch. | 1 | Job per Month |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054