- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of Indian Institute of Technology Mandi
- >
NTID 42741591
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowProviding And Fixing Of 6 Nos in Mandi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Providing And Fixing Of 6 Nos " in Mandi, India.
Indian Institute of Technology Mandi
Mandi, Himachal Pradesh, India
NTID 42741591
- Opening Date : Mon 8th December, 2025
- Closing Date : Fri 5th December, 2025
- ₹ 1345898.00
- NTID 42741591
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
26918.00 -
Document Cost
1180.00 -
Estimated Cost
1345898.00
BOQ Items Total Items : 39 | Total Qty : 3210
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth with all lead and lift, as directed by Engineer-in-charge. a) All kinds of soil as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 25.00 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a) 1:5:10 (1 cement : 5 fine sand derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 2.00 | Cum |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 3.00 | Cum |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for : a)Foundations, footings, bases of columns, etc. for mass concrete as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 13.00 | Sqm |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 540.00 | Kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054