- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Yamuna Expressway Industrial Development Authority
- >
NTID 47137072
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowProviding And Fixing Interlock in Multi city - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Providing And Fixing Interlock" in Multi city, India.
Yamuna Expressway Industrial Development Authority
Multi city, Uttar Pradesh, India
NTID 47137072
- Opening Date : Thu 29th October, 2026
- Closing Date : Tue 27th October, 2026
- ₹ 2602047.00
- NTID 47137072
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
52100.00 -
Document Cost
860.00 -
Estimated Cost
2602047.00
BOQ Items Total Items : 9 | Total Qty : 5589.21
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in rough excavation, banking excavaated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1 / 2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per ( MOST / A.R. / yeida ) For all kind of soil. | 1006.64 | CUM |
| 2 | Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all material, Labour, Tools&plants etc required for proper completion of the work. | 106.61 | CUM |
| 3 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering,shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum.Excess/less cement used as per design mix is payable/recoverable All works upto plinth level. (DAR/5.33.1/Based on UPPWD/SOR-2020). | 15 | CUM |
| 4 | Foundations, footings, bases of columns, etc. for mass concrete. (DAR/5.9.1/Based on UPPWD/SOR-2020)) | 7 | SQM |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all Complete upto plinth level & above plinth level.(DAR 2018-5.22)Based on UPPWD SOR/2020Thermo Mechanically Treated bars of grade Fe-500D. (DAR 2018-5.22.6)Based on UPPWD SOR/2020 | 1177.5 | KG |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054