ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowProviding And Fixing Concertin in Parganas - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Providing And Fixing Concertin" in Parganas, India.
WEST BENGAL HOUSING INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED
Parganas, West Bengal, India
NTID 47103893
- Opening Date : Fri 30th October, 2026
- Closing Date : Wed 28th October, 2026
- ₹ 459824.00
- NTID 47103893
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
9196.00 -
Document Cost
Refer Documents -
Estimated Cost
459824.00
BOQ Items Total Items : 5 | Total Qty : 1873.784
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia. 10 metre openable length (total length 90 m), having 50 nos. rounds per 6 metre length, upto 3.00 m height of wall with existing angle iron ‘Y’ shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape (R.B.T.) / Spring core (2.5 mm thick) wire of high tensile strength of 165 kg/ sq. mm with tape (0.52 mm thick) and weight 43.478 gm/ metre. (Cost of M.S. angle, C.C. blocks shall be paid separately). | 620 | Mtr. |
| 2 | Structural steel work riveted, bolted or welded in single section, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1124.504 | KG |
| 3 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work. | 127.28 | Sq. m |
| 4 | Add @ 18.00 % GST | 1 | No. |
| 5 | Add @1.00 % Cess | 1 | No. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054