- Home
- >
- Tender
- >
- Andhra Pradesh Tender
- >
- Department of Hindustan Shipyard Limited
- >
NTID 43310773
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowPropulsion System-tail Shaft in Visakhapatnam - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Propulsion System-tail Shaft " in Visakhapatnam, India.
Hindustan Shipyard Limited
Visakhapatnam, Andhra Pradesh, India
NTID 43310773
- Opening Date : Mon 5th January, 2026
- Closing Date : Mon 5th January, 2026
- ₹ 0.00
- NTID 43310773
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
50000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 15 | Total Qty : 19
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Rope guard and poker gauge reading Rope guards along with Net cutters to be removed and re-fitted, Poker gauge readings(shaft wear down clearences) to bemeasured and recorded in presence of IRS and ship staff, all required consumables are in contractor scope | 1 | NO |
| 2 | Shaft Eddy cones and Eddy plates Port and Stbd, Shaft Eddy cones and Eddy plates removed and re-fitted along with materials, all required materials and consumables are in contractor scope | 1 | NO |
| 3 | Buffing and polishing of Propeller blades Buffing and polishing of Propeller blades, varnish to be applied, Propeller to be covered with tarpaulins/wrapping sheet after buffing and removed before undocking, all required materials and consumables are in contractor scope | 1 | NO |
| 4 | Propeller blade bolts sealed with putty Propeller blade bolts to be sealed with underwater putty, putty material (Lapox Resin L-12, Hardener k-6, Titanium Dioxide Powder) to be supplied and applied, all required materials and consumables are in contractor scope | 1 | NO |
| 5 | Tail shaft removal and re-fitment Complete withdrawal of tail end shaft along with Propeller(45 tons) by disconnecting the muff couplings. All fitted bolts to remove from muff coupling.After withdrawal the tail end shaft to place on support on dock floor safely with all lockings.inspection of tail end shaft and propeller,cleaning,polishing,calibration and surface roughness checks of tail shaft and stern tube bushes. required NDT tests(MPI for shaft and DP for propeller) to be carried out to fulfil class requirements and shafts to be produced for survey. After completion of survey same to be fitted in place as perprocedure.all clearances to measure and record. All activities to be carried out in the presence of shipstaff.Heavy gauge Eye pads to be fabricated and welded in shaft line for shaft lifting.all consumables,certified 25 tons chain pulleys and lifting belts,hydraulic pumps and jacks,pullers, lifting tools andslings,eye pad welding and testing,machining works,welding and gas cutting works are in contractor scope. | 1 | LS |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054