Directorate of Tourism
Shimla, Himachal Pradesh, India
NTID 44594069
- Opening Date : Wed 1st April, 2026
- Closing Date : Mon 30th March, 2026
- ₹ 1872749.00
- NTID 44594069
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
37455.00 -
Document Cost
500.00 -
Estimated Cost
1872749.00
BOQ Items Total Items : 14 | Total Qty : 6973.85
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth iincluding carriage of material up to all leads and lifts and as per direction of Engineer incharge dumping site/disposal site shall be arranged by the contractor at he own cost and nothing shall be paid extra. All kinds of soil | 108.26 | Per Cubic Meter |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth including carriage of material up to all leads and lifts and as per direction of Engineer incharge dumping site/disposal site shall be arranged by the contractor at he own cost and nothing shall be paid extra. Ordinary rock | 46.40 | Per Cubic Meter |
| 3 | Stone /Boulder filling under floor /back fill dry hand packed including carriage of material upto all leads and lifts and as per direction of Engineer incharge. | 56.15 | Per Cubic Meter |
| 4 | Filling available excavated earth (including rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, including carriage of material up to all leads and lifts and as per direction of Engineer incharge. | 86.60 | Per Cubic Meter |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) including carriage of material up to all leads and lifts and as per direction of Engineer incharge. | 6.50 | Per Cubic Meter |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054