- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of Tourism and Cultural Affairs Dept. Maharashtra
- >
NTID 46710755
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowProposed Construction Of Compo in Buldhana - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Proposed Construction Of Compo" in Buldhana, India.
Tourism and Cultural Affairs Dept. Maharashtra
Buldhana, Maharashtra, India
NTID 46710755
- Opening Date : Mon 21st September, 2026
- Closing Date : Sat 19th September, 2026
- ₹ 3403441.00
- NTID 46710755
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
34034.00 -
Document Cost
1180.00 -
Estimated Cost
3403441.00
BOQ Items Total Items : 19 | Total Qty : 2124.9
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Labour charges for removing grass , thorney shrubs ,Jungli shrub ,Kubabul and alike grass along road side making the ground clean by showel and phavaras etc.complete. | 440 | SQ.M |
| 2 | Cutting down trees including trunks and branches with girths above 30cm to 60cm and stacking the materials neatly with all lifts and lead of 1000m as directed and earth filling in the depression / pit if any. | 11 | Nos. |
| 3 | Cutting down trees including trunks and branches with girths above 60cm to 90cm and stacking the materials neatly with all lifts and lead of 1000m. as directed and earth filling in the depression/pit if any. | 5 | Nos. |
| 4 | Dismantling stone masonry in lime or cement mortar including stacking them aterils as directed with all leads, lifts etc. | 120 | CU.M |
| 5 | Providing and fixing double scaffolding system(cuplocktype)on the exterior side of building/ structure ,including additional rows of scaffolding in stepped manner as per requirement of site,made with 40mm diaM.S.tube, placed 1.5 metre centre to centre,horizontal & vertical tubes joint with cup & lock system with M.S.Tubes ,M.S. tube challis ,M.S .clamps and staircase system in the scaffolding for working platform etc.and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter.The scaffolding system shall bestiffened with bracings, runners, connecting with the building etc, wherever required, if feasible,fo rinspection of work at required locations with essential safety features for the workmen etc.,complete as per directions and approval of Engineer-in-charge.Note:-(1)The elevational area of the scaffolding shall be measured for payment purpose.(2)The payment will be made once only for execution of all items for such works. | 330 | SQ.M |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054