Inquiry NowProposed Compound Wall Work g in Pune - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Proposed Compound Wall Work g" in Pune, India.
Director of Technical Education Department Mumbai
Pune, Maharashtra, India
NTID 44348499
- Opening Date : Sat 21st March, 2026
- Closing Date : Fri 20th March, 2026
- ₹ 0.00
- NTID 44348499
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
126000.00 -
Document Cost
1180.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 11 | Total Qty : 7671.536
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete.(Lift upto 1.5m.) By Mechanical Means (Item No. 21.02) | 730.80 | Cubic Metre |
| 2 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete.(Lift upto 1.50 m) By Mechanical Means (Item No. 21.06) | 682.08 | Cubic Metre |
| 3 | Excavation for foundation in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete.(Lift from 1.5m to 3.0m) By Mechanical Means (Item No. 21.04) | 389.76 | Cubic Metre |
| 4 | Excavation for foundation in Hard-rock by blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete.(Lift from 1.5m To 3.0 m) By Mechanical Means (Item No. 21.18) | 292.32 | Cubic Metre |
| 5 | Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete.(By Mechanical Means) a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% (Item No. 12.03) | 243.60 | Cubic Metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054