- Home
- >
- Tender
- >
- Karnataka Tender
- >
- Department of Military Engineer Services
- >
NTID 42869730
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Periodical Maint in Bangalore - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Periodical Maint" in Bangalore, India.
- Opening Date : Mon 22nd December, 2025
- Closing Date : Fri 19th December, 2025
- ₹ 4200000.00
- NTID 42869730
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
84000.00 -
Document Cost
500.00 -
Estimated Cost
4200000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum |
BOQ Items Total Items : 83 | Total Qty : 2420
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | SCHEDULE OF WORKS | ||
| 2 | Note - 1) The scheduled items pertaining to Radar Testing Platform (RTP) alongwith other scheduled items shall be handed over to contractor on as is what is basis and the contractor shall have a visit to the RTP and other schedule sites before quoting their rates. (ii) The Details of notes as applicable for schedule of works have been mentioned in the tender documents. | ||
| 3 | Disconnecting electrically operated squirrel cage crane heavy duty motors of cap 13.4 HP, AC 3 phase, 415 Volts from existing location of electro mechanically driven winch unit by unscrewing nuts, bolt and dismantlling all components/parts carefully, checking all components in and including servicing, greasing, oiling complete etc as applicable on the site for smooth functioning all as per site requirements and reassembling, alignment of motor complete with electro mechanically driven winch unit and testing complete all as directed by Engineer-in-charge. | 4.00 | EACH JOB |
| 4 | Disconnecting locking pin motors of cap 1 HP 3 Phase 415 Volts in respect of locking pin unit from existing location of RTP by unscrewing of nuts, bolt and dismantlling all parts carefully, checking all components in and including servicing, greasing, oiling etc complete all as per site requirements and reassembling, alignment of motor complete with the existing pin unit and testing complete all as directed by Engineer-in-charge. Note for Item No. 1 & 2 : (i) If motor rewinding works are required during currency of contract, the same shall be measured and paid separately under relevent item of the schedule (2) The contractor is responsible for functionig of winch motors and locking pin motors efficiently during entire currency period of the contract. (Location - RTP installation) | 4.00 | EACH JOB |
| 5 | Labour only for dismanling all components of winch motor gear box assembly unit complete - 01 set using necessary tools and plants carefully, removing of existing old grease and other lubricating materials from all parts by rubbing, scrapping and cleaning with the cotton waste, diesel and other cleaning material as applicable etc and applying Greasing to spindles, guide rollers, platform locking pins etc arrangements using gease gun etc and after applying fresh grease, assembling all parts carefully, assembling, alignment with winch unit properly testing complete all as directed by Engineer-in-charge. | 4.00 | EACH JOB |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054