- Home
- >
- Tender
- >
- Tripura Tender
- >
- Department of Public Works Department
- >
NTID 45397319
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowPatch Soling Placing Gunny Ba in Panisagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Patch Soling Placing Gunny Ba" in Panisagar, India.
- Opening Date : Wed 10th June, 2026
- Closing Date : Wed 10th June, 2026
- ₹ 2426968.00
- NTID 45397319
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
48539.00 -
Document Cost
1000.00 -
Estimated Cost
2426968.00
BOQ Items Total Items : 10 | Total Qty : 12557.5
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Brick on edge soling Providing and laying brick on edge soling layer on prepared subgrade according to lines, grades and cross section shown on the drawing, filling joints with sand, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. | 108.00 | Sqm |
| 2 | Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. | 913.50 | Sqm |
| 3 | Brick edging laid length wise Providing and laying brick edging laid lengthwise on prepared subgrade according to lines, grades and cross section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412 | 160.00 | M |
| 4 | Supplying of mixed class brick bats at depression & pot holes of the road i/c loading unloading stacking as a measurable shape and spreading the same uniformly in different roads as per direction of the Engineer - in - Charge. | 460.00 | Cum |
| 5 | Supplying of rubbish at depression & pot holes of the road i/c loading unloading stacking as a measurable shape and spreading the same uniformly in different roads as per direction of the Engineer - in - Charge. | 350.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054