- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of Travancore Cochin Chemicals Limited
- >
NTID 43542940
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowPainting Of Agc Plant Building in Udyogamandal - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Painting Of Agc Plant Building" in Udyogamandal, India.
Travancore Cochin Chemicals Limited
Udyogamandal, Kerala, India
NTID 43542940
- Opening Date : Wed 28th January, 2026
- Closing Date : Tue 27th January, 2026
- ₹ 0.00
- NTID 43542940
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
11500.00 -
Document Cost
1000.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 3 | Total Qty : 4210
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Painting the RCC column, beam, slab, bottom walls etc...., of building at all elevations and locations up to 20 M from existing floor level with two coat of chlorinated rubber paint, after cleaning the surface, including all labour charges, hire for tools and brushes, all consumable all safety protection to workers, cable, pipe line, machineries, equipment, including covering with tarpaulin or similar materials without causing hindrance to plant operation, all charge for scaffolding, cleaning the plant area after work etc., complete (required chlorinated rubber paint and thinner be supplied free of cost by TCC) | 3600.000 | Sq.m |
| 2 | Cement plastering over fibre net with cement mortar1:4 for a minimum thickness of 20 mm thick in two layer for wall, beam, column & slab etc up to a height of 20m from ground level and floor level excluding cost of supplying and fixing fibre net, and minimum of 7 days curing after plastering including all labour charges, hire for tools and plants, cost of all materials, all charge for scaffolding including all safety measures like safety net,safety belt, helmet, goggles / face sheld, safety shoes, life line for hooking safety belt at contractors risk and cost,approved by Engineer. | 600.000 | Sq.m |
| 3 | Engaging Male workers for executing miscellaneous items of work at all locations and elevation , including all labour charges , ESI , PF KCWWF contributions and all other benefits payable , hire for tools and PPE's all safety precautions and work permit system etc. complete as per the instruction of Engineer -In-Charge. | 10.000 | No. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054