ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowPainting Chitine Store Room D in Kollam - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Painting Chitine Store Room D" in Kollam, India.
NTID 45969781
- Opening Date : Tue 28th July, 2026
- Closing Date : Sat 25th July, 2026
- ₹ 378270.00
- NTID 45969781
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 12 | Total Qty : 2050.814
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Renovation work | ||
| 2 | OD310531/2025-2026 Cleaning and preparing the surface with pressure washer and appropriate cleaning accessories. | 6.000 | Day |
| 3 | 13.111.1 Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface | 1708.678 | sqm |
| 4 | 13.99.1 Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work | 160.142 | sqm |
| 5 | 24.2 Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works. | 16.000 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054