Tender for GOVERNMENT OF JHARKHAND - NTID 29348005
GOVERNMENT OF JHARKHAND
Khunti, Jharkhand, India
NTID 29348005
- Opening Date : Fri 21st October, 2022
- Closing Date : Thu 20th October, 2022
- ₹ 14999021.00
- NTID 29348005
Ordinary Repair Work In Hatia Lodhma Karra Khunti Road (mdr 032) From Km.17.00 To 23.00
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
300000.00 -
Document Cost
10000.00 -
Estimated Cost
14999021.00
BOQ Items Total Items : 16 | Total Qty : 27481003.715
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)In area of light jungle | 0.735 | Hect. |
2 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately (By Mechanical Means) Bituminous Course- | 4.16 | m3 |
3 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately (By Mechanical Means), Granular Course- | 14.10 | m3 |
4 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) | 127.88 | m3 |
5 | Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.) | 8175.00 | m2 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane