Inquiry NowOperation And Maintenance Of 4 in Nawabganj - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Operation And Maintenance Of 4" in Nawabganj, India.
UTTAR PRADESH JAL NIGAM
Nawabganj, Uttar Pradesh, India
NTID 45787129
- Opening Date : Wed 15th July, 2026
- Closing Date : Wed 15th July, 2026
- ₹ 197855246.00
- NTID 45787129
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1978000.00 -
Document Cost
23600.00 -
Estimated Cost
197855246.00
BOQ Items Total Items : 14 | Total Qty : 5713373.38
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Operation of 40 MLD Tertiary Treatment Plant at Bingwan 210 MLD STP Campus based on Biological treatment (MBR) including ultrafiltration and Reverse osmosis system with operating staffs (Plant Manager, Safety officer, supervisors, Operators, Elecrician, Mechanic, Chemist, Lab Assistant, Scada operatos etc) for all works as per necessary requirement at each unit of TTP (TTP feed sump, Fine Screen, Bioreactor, UF membrane scour air, MBR Permate Tank, RO system, Degasser Tower, RO permeate Tank , etc and its associated parts) to meet desired parameters for Thermal Power Plant.Upkeeping of Plant and Campus should be ensured. For first year from date of start of O&M work. | 12 | months |
| 2 | Operation of 40 MLD Tertiary Treatment Plant at Bingwan 210 MLD STP Campus based on Biological treatment (MBR) including ultrafiltration and Reverse osmosis system with operating staffs (Plant Manager, Safety officer, supervisors, Operators, Elecrician, Mechanic, Chemist, Lab Assitant, Scada operatos etc ) for all works as per necessary requirement at each unit of TTP (TTP feed sump, Fine Screen, Bioreactor, UF membrane scour air, MBR Permate Tank, RO system, Degasser Tower, RO permeate Tank , etc and its associated parts) to meet desired parameters for Thermal Power Plant.Upkeeping of Plant and Campus should be ensured. For second year from date of start of O&M work. | 12 | months |
| 3 | Operation and Maintenence of 40 MLD Tertiary Treatment Plant at Bingwan 210 MLD STP Campus based on Biological treatment (MBR) including ultrafiltration and Reverse osmosis system with operating staffs (Plant Manager, Safety officer, supervisors, Operators, Elecrician, Mechanic, Chemist, Lab Assitant, Scada operatos etc ) for all works as per necessary requirement at each unit of TTP (TTP feed sump,Fine Screen,Bioreactor,UF membrane scour air,MBR Permate Tank,RO system,Degasser Tower,RO permeate Tank , etcand its associated parts) to meet desired parameters for Thermal Power Plant.Upkeeping of Plant and Campus should be ensured. For third year (8 months) from date of start of O&M work. | 8 | months |
| 4 | Chemical Consumption required at 40 MLD TTP to meet out the desired outlet parameters as per requirment of Panki Thermal power Plant. Methanol(Liquid,100%) | 903163.00 | kg |
| 5 | Citric Acid (powder,100%) | 50648.00 | kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054