- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of Indian Institute of Technology Madras
- >
NTID 47253489
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowNon-comprehensive Annual Maint in Chennai - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Non-comprehensive Annual Maint" in Chennai, India.
Indian Institute of Technology Madras
Chennai, Tamil Nadu, India
NTID 47253489
- Opening Date : Thu 12th November, 2026
- Closing Date : Wed 11th November, 2026
- ₹ 7748000.00
- NTID 47253489
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
154960.00 -
Document Cost
Refer Documents -
Estimated Cost
7748000.00
BOQ Items Total Items : 27 | Total Qty : 1728
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Solar Power Plants | ||
| 2 | Cost of Non - Comprehensive Annual Maintenance Contract of solar plant of total installed capacity of 3.86 MWp as per the list installed at the roof top of the building that includes routine , preventive & break down maintenance for period of One year as per the scope and detailed specifications. The Contractor should deploy team of 1 Engineer and required no. of manpower for carrying out the preventive and breakdown maintenance as per the schedule for the entire period of contract. Any additional manpower required for attending breakdowns shall be in the scope of the contractor.Inverters will be covered under warranty by IIT, Madras and co ordinating with the OEM for rectification/ replacement of the Inverters under warranty is under the scope of the contractor. | 16 | Month |
| 3 | Supply and installation of DCR make Solar Photovoltaic Module of required capacity consisting Mono/Poly Crystalline silicon solar cells manufactured in India as per the latset ALMM List of MNRE conforming to IS14286/IEC61215, IS/IEC61730-Part-1, IS/IEC61730-Part-2.Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. Make and model shall be got approved before supply. | 40 | KWp |
| 4 | Supply and cabling of 4 Sq.mm DC Solar copper cable from Solar panels to the DCDB with proper cable dressing with suitable cable tie in the already available channel/PVC pipe/GI duct etc at solar power plants available in various buildings.. | 500 | Metre |
| 5 | Supply and providing suitable MC4 connectors for DC cabling as required in the DC array part upto DCDB at solar power plants available in various buildings. | 500 | Nos |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054