NTID 44401666
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowNew - Excavation Of Kalipahari in Bankura - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "New - Excavation Of Kalipahari" in Bankura, India.
Department Of Water Resources
Bankura, West Bengal, India
NTID 44401666
- Opening Date : Fri 27th March, 2026
- Closing Date : Wed 25th March, 2026
- ₹ 1080529.00
- NTID 44401666
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
21611.00 -
Document Cost
Refer Documents -
Estimated Cost
1080529.00
BOQ Items Total Items : 21 | Total Qty : 1989080.564
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 2040.000 | Sqm |
| 2 | Excavation in ordinary soil / mixed soil i.e. clay mixed with moorun , kankar, pebbles / silt dry or moist / slushy silt / sticky soil for WDS / WHS / RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1500 m including spreading , leveliing disposed spoils at disposed area. ( mode of measurement : pre work and postwork) | 3370.690 | Cum |
| 3 | Excavation in gravel / moorum / kankar / compact moorum /very much weathered rock / sticky soil mixed with moorum or ghooting for WDS / WHS / RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1500 m including spreading , leveliing disposed spoils at disposed area. ( mode of measurement : pre work and postwork) | 2696.550 | Cum |
| 4 | Excavation in soft weather rock / solt laterite rocks for WDS / WHS/RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1500 m including spreading, leveliing disposed spoils at disposed area. (mode of measurement : pre work and post work) | 674.140 | Cum |
| 5 | Fine dressing the sub-grade slope / flank etc. to proper profile including cutting and removing spoils where necessary. | 1600.000 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054