- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of Drinking Water And Sanitation Department
- >
NTID 44851599
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowNew Construction Of Toilet Se in Pakur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "New Construction Of Toilet Se" in Pakur, India.
- Opening Date : Sat 18th April, 2026
- Closing Date : Fri 17th April, 2026
- ₹ 4098320.00
- NTID 44851599
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
82000.00 -
Document Cost
5000.00 -
Estimated Cost
4098320.00
BOQ Items Total Items : 111 | Total Qty : 10101.071
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | NEW CONSTRUCTION OF TOILET | ||
| 2 | Earth work in excavation in foundation trenches in ordinary soil(vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | 33.138 | Per M3 |
| 3 | Extra for earthwork in hard soil as per specification and direction of E/I. (vide classification of soil item B) | 33.138 | Per M3 |
| 4 | Filling in foundation trenches and plinth in layers not exceeding 150 mm thick, well watered, rammed, fully compacted and fine dressed with earth obtained from exacavation of foundation trenches with in a lead of 50 M and lift of 1.5 M all complete as per building specifications and direction of E/I. (Mode of measurment-compacted volume). | 24.854 | Per M3 |
| 5 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 20.565 | Per M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054