- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Moradabad Development Authority
- >
NTID 45997683
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now6-naya Moradabad Yojana Ke Sec in Moradabad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "6-naya Moradabad Yojana Ke Sec" in Moradabad, India.
Moradabad Development Authority
Moradabad, Uttar Pradesh, India
NTID 45997683
- Opening Date : Wed 5th August, 2026
- Closing Date : Tue 4th August, 2026
- ₹ 4211003.00
- NTID 45997683
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
84300.00 -
Document Cost
590.00 -
Estimated Cost
4211003.00
BOQ Items Total Items : 12 | Total Qty : 5091
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 min width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. DSR NO. 2.8.1/2023(rate-260.30). | 284 | CUM |
| 2 | Providing and laying Cement Concrete 1: 4: 8 (1 Cement, 4 Coarse sand, 8 graded Brick ballast 40 mm nominal size ) including supply of all materials, labour and T & P etc. required for proper complition of the work and curing complete also including cost of form work in foundation & floor .PWD SOR 2025 item No 275 | 38 | Cum |
| 3 | Brick work with class 150 bricks of designation 15 in foundation and plinth in: cement mortar 1:4(1 cement :4 coarse sand )(as per DAR) OR DSR S.I NO. 6.1.1/2023 | 92 | cum |
| 4 | Brick work with class 150 bricks of designation 15 in superstructure above plinth level up to floor 5th level in all shapes and sizes in :cement mortar 1:4(1 cement :4 coarse sand )(as per DAR) OR DSR S.I NO. 6.4.1/2023(rate-9819.98) | 113 | cum |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) dsr 2023/5.1.2(rate-9045.75) | 58 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054