- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of PANCHAYAT SAMITI
- >
NTID 31434643
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowName Of Work Special Repairs T in Anjangaon - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Name Of Work Special Repairs T" in Anjangaon, India.
PANCHAYAT SAMITI
Anjangaon, Maharashtra, India
NTID 31434643
- Opening Date : Thu 6th April, 2023
- Closing Date : Mon 3rd April, 2023
- ₹ 2075654.00
- NTID 31434643
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
20757.00 -
Document Cost
1000.00 -
Estimated Cost
2075654.00
BOQ Items Total Items : 30 | Total Qty : 18980.35
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Item No.1 : Cleaning, cutting ,throny shrubs, bushes ,grass including all lead & lift and depositing as directed , including 1 % Cess for labour welfare etc complete . | 5122.00 | Sq m |
| 2 | Item No. 2 : Removing the pitching including necessary excavation if required and stacking them neatly including all lead & lift , including 1 % cess on labour Welfare etc. complete . | 932.00 | Cum |
| 3 | Item No.3 : Stripping Up to 10 cm depth in all kind of soil, Soft Murum hard murum, with all lead & Lift and depositing as directed by Engineer in charge including 1 % Cess on Labour Welfare etc.complete | 396.00 | Cum |
| 4 | Item No.4 : Excavation in all kinds of Soils & Soft murum including boulders up to 0.6 m diameter (0.113cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete . | 236.00 | Cum |
| 5 | Item No.5 : Excavation in Hard Murum including boulders up to 0.6 m diameter (0.113 cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete . | 551.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054