- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Directorate of Local Bodies UP
- >
NTID 44965768
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowNagar Panchayat Jahangeerganj in Ambedkar Nagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Nagar Panchayat Jahangeerganj " in Ambedkar Nagar, India.
Directorate of Local Bodies UP
Ambedkar Nagar, Uttar Pradesh, India
NTID 44965768
- Opening Date : Thu 14th May, 2026
- Closing Date : Wed 13th May, 2026
- ₹ 2470994.00
- NTID 44965768
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
247100.00 -
Document Cost
3440.00 -
Estimated Cost
2470994.00
BOQ Items Total Items : 5 | Total Qty : 1334.775
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth v ork in excavation in foundation in ordinary soil i/C lift upto 1.50 mtr.& lead upto 50.00 mtr and dressing of sidcs and ramming of bottom and disposal of surplus excavatcd earth as directed bu the E/l within a distancc of 50 m. (as per SI No. 251) Nala | 564.300 | m |
| 2 | Disposal of excavated material from site upto 5 Km Qty of same as above item 1 @85% | 479.655 | m |
| 3 | Providing and laying in cement concrete 1:3:6 (1 cerment:3 coarse sand:6graded Stone ballast aggregate 20 mm nominal size) and curing complete, including cost of form work in foundation and floors As per PWD-279A Nala | 37.800 | m |
| 4 | R.C.G work with cement approved course sand and 2 cm (3/4 ) gauge approved stone ballast in the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its bending but including its fixing and bending the same with 24 B.W.G.G.I. binding wire and including neccessary centering and shuttering etc. and also including supply of all materials, labours and T & P etc. required for proper completion of the work. Binding wire cost being included in the item. Nala Cover | 141.75 | m |
| 5 | steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastages and over lapginq and hookes.rcc qty @1% in Nala | 111.27 | qtl |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054