- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED
- >
NTID 43806486
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowMtps I Mill Plant I Complete O in Salem - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Mtps I Mill Plant I Complete O" in Salem, India.
TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED
Salem, Tamil Nadu, India
NTID 43806486
- Opening Date : Tue 17th February, 2026
- Closing Date : Mon 16th February, 2026
- ₹ 0.00
- NTID 43806486
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
18700.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 27 | Total Qty : 451.7
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Draining of Mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. After inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (Department vehicle will be provided for drawl of oil at free of cost). | 2 | Mills |
| 2 | Charges for cleaning the gearbox internals like worm shaft and worm wheel. Draining the cooling water from cooling coil, cleaning and inspection of worm wheel teeth, cleaning the cooling coil Arresting the leakages in the water line, assembling back the cooling coil covers, filling the gearbox oil up to normal level. | 6 | Mills |
| 3 | Charges for providing wedges between lower skirt and Mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. Lowering the thrust bearings and reassembling of all the above parts, providing SS shims at the bottom cover flange. Blue matching the worm shaft and worm wheel engagement till we get 20 to 50% pattern by trial method releasing/ providing thin SS shim at the bottom cover flange and to get proper running clearance and centering of engagement. | 6 | Mills |
| 4 | Charges for dismantling and removing worn out thrust bearing of Mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft and assembling back Old/new thrust bearing after heating the racer in oil bath.(If necessary) | 2 | Mills |
| 5 | Charges for Renewal of thrust bearing adopter by oil heating and using necessary fixture for assembling the adopter in correct position after positioning the shims below the worm gear hub lock nut. Removing the thrust bearing adopter (worn out) and assembling the Old/new adopter by heating (If necessary) | 2 | Mills |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054