- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of The Fertilisers And Chemicals Travancore Ltd.
- >
NTID 44328030
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Maintenance Work in Ernakulam - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Maintenance Work" in Ernakulam, India.
- Opening Date : Sat 28th March, 2026
- Closing Date : Fri 27th March, 2026
- ₹ 0.00
- NTID 44328030
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
12000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum |
BOQ Items Total Items : 41 | Total Qty : 2488
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Maintenance Works in Ball Mill during ATA 2026-Oil Seal/Pinion Inspection/Alignment | ||
| 2 | Maintenance Works in Ball Mill in PAP During ATA 2026: Work Involves: Collection of required materials from store, tools and tackels and make required site arrangements. After getting clearance, decouple the motor and gearbox. Unbolt the motor from the foundation. Lift and move the motor from the foundation as per site instructions. Any dismantling of platform/providing temporary support structures etc. if required shall be done as per site requirement. Dismantle the coupling from the gearbox high speed shaft. Decouple the gearbox slow speed shaft and pinion. Unbolt the gearbox bearing side covers, gearbox top cover and shift to a safe location. Lift the high speed shaft from the gearbox. Remove the damaged oil seal. Inspect the high speed shaft for any wear. Transport new shaft if required from the store. Provide new oil seal as per instructions. Mount back the high speed shaft. Check the float of the bearings of all the shafts, provide shims as per instructions. Mount back the gearbox cover and tighten the bolts. Check the final float is within the limits. Mount back the gearbox high speed side coupling half. Erect back the motor to the foundation. Dismanlte the pinion plummer block top covers. Provide assistance for bearing inspection/bearing replacement as per site instructions. Mount back the plummer block covers and tighten the cover bolts. Alignment/meshing of pinion and girth gear shall be checked. Foundation bolts of pinion shall be loosened/dismantled and mounted back/tightened as per requirement. Alignment of pinion and gearbox, gear box and motor shall be done as per site instructions. After alignment couple the pinion,motor and gearbox. All foundation bolts of gearbox and motor shall be tightend and coupling guard shall be provided. After completion of work,take trial run. Temporary structures shall be removed and site shall be cleared. Dismantled platforms shall be welded back. | 1 | LS |
| 3 | Bearing Replacement of Ball Mill Drive Pinion Make necessary site arrangements for the work. De couple gearbox and pinion. Dismantle the pinion foundation bolts. Lift and move the pinion assembly to the work shop. Dismantle the pinion side coupling. Unbolt andn remove the plummer blocks. Unmount the bearings from pinion shaft. Properly clean the shaft and inspect the shaft for any damage. Plummer blocks shall be cleaned and inspected for any damage including interference check. New plummer blocks shall be provided if required. Scope of transportation of plummer blocks from store is in this scope. Mount new bearings on the shaft and properly tighten them. Mount the plummer blocks.Mount back the coupling. Transport the pinion assesmbly to ball mill and erect it on the foundation. Mount the foundation bolts.Check and correct the meshing of pinion and girth gear. After correcting the meshing, full tighten the pinion foundation bolts.Align the pinion and gearbox. After alignment,couple the pinion and gearbox. Gearbox foundation bolts shall be full tightened. Gearbox motor alignment shall be checked. Motor shifting for alignment if required shall be done.After completion of work,clear the site and remove the set ups made for the work. (2 nos bearings have to be replaced).This actvity need to be done if the bearings of drive pinion found defective during inspection against activity 1. | 1 | LS |
| 4 | Supply/unloading and Handing over of 650/1100V, Aluminium conductor PVC/XLPE insulated, armoured PVC outer sheathed cable of size 3.5 cores x 400 sq.mm. The cable shall be supplied at Q10 installation of FACT at Willingdon Island and must be unloaded as per the instruction of engineer-in-charge. Vechicles/loading and unloading shall be in contractors scope | 110 | M |
| 5 | Supply/unloading and Handing over of 650/1100V, Aluminium conductor PVC/XLPE insulated, armoured PVC outer sheathed cable of size 3.5 cores x 50 sq.mm. The cable shall be supplied at Q10 installation of FACT at Willingdon Island and must be unloaded as per the instruction of engineer-in-charge. Vechicles/loading and unloading shall be in contractors scope | 250 | M |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054