Tender for Public Works Department - NTID 32189242
Public Works Department
Akhnoor, Jammu and Kashmir, India
NTID 32189242
- Opening Date : Mon 12th June, 2023
- Closing Date : Sat 10th June, 2023
- ₹ 3400000.00
- NTID 32189242
Macadamization Of Following Road 1) Akhnoor Road To Santra Morh And Allied Links In Patches And Stretches 2) Talab Tillo To Santra Morh And Allied Links In Patches And Stretches (under Pot Holes Free Roads 2023-24.
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
68000.00 -
Document Cost
600.00 -
Estimated Cost
3400000.00
BOQ Items Total Items : 10 | Total Qty : 19622
# | Item | Quantity | Units |
---|---|---|---|
1 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means | 2200.00 | Sqm |
2 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | 62.00 | Cum |
3 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity | 110.00 | Cum |
4 | Providing and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications | ||
5 | On W.B.M. @ 0.75 Kg/sqm | 824.00 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane