- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Irrigation Department
- >
NTID 43186276
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowLot 13 Construction Of 7 Nos in Sambhal - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Lot 13 Construction Of 7 Nos " in Sambhal, India.
Irrigation Department
Sambhal, Uttar Pradesh, India
NTID 43186276
- Opening Date : Mon 22nd December, 2025
- Closing Date : Sat 20th December, 2025
- ₹ 0.00
- NTID 43186276
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
8000.00 -
Document Cost
856.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 10 | Total Qty : 447.142
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T&P leads and lift etc complete. | 51.840 | CUM |
| 2 | Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 6.770 | CUM |
| 3 | Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 12.700 | CUM |
| 4 | Providing and laying of RCC (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. (Excluding rate of Reinforcement Steel ) | 4.82 | CUM |
| 5 | Brick work M-105 in 1:3 cement mortar including cost of all material, labour and T&P etc. complete required for proper complition of work. | 19.10 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054