- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Rajya Krishi Utpadam Mandi Parishad
- >
NTID 44951123
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowLink Road Pure Note Se Kakrihi in Allahabad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Link Road Pure Note Se Kakrihi" in Allahabad, India.
Rajya Krishi Utpadam Mandi Parishad
Allahabad, Uttar Pradesh, India
NTID 44951123
- Opening Date : Mon 27th April, 2026
- Closing Date : Mon 27th April, 2026
- ₹ 2699000.00
- NTID 44951123
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
270000.00 -
Document Cost
4800.00 -
Estimated Cost
2699000.00
BOQ Items Total Items : 16 | Total Qty : 2831.15
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in cutting or in embankment in ordinary soil excavtion to be in the form of reqular pits not exceeding 1/2 metre in deptk and earthwork in embankment to be in 20 cm layers including ramming & dressing the surface to required levels and slopes and also inclduing 1.5 metre lifts and 30m lead the earth from cutting to be used in making embankement or to be deposites as directed as directed by EC | 264.000 | cum |
| 2 | Excavation in foudation | 79.200 | cum |
| 3 | W.B.M. Grading-3 Providing, laying, spreading and compacting stone aggregated of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading-3 as per Technical Specification Clauses 405. | 75.000 | cum |
| 4 | M150 class brick work in 1:4 in cement and coarse sand in foundation and plinth including all supply of all materials | 54.650 | sqm |
| 5 | cement concrete with 20/10 mm gauge approved stone grit coarse sand 2.5fm and cement proportion of M20 1:1.5:3 including supply of all materials of all materials | 247.500 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054