- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of Kerala Tourism Development Corporation Limited
- >
NTID 44014881
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowLeak Rectification By Water Pr in Kumily - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Leak Rectification By Water Pr" in Kumily, India.
- Opening Date : Thu 26th February, 2026
- Closing Date : Tue 24th February, 2026
- ₹ 0.00
- NTID 44014881
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
6700.00 -
Document Cost
708.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 5 | Total Qty : 598
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | leak retification | ||
| 2 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 199.000 | Sqm |
| 3 | 12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) | 199.000 | Sqm |
| 4 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured) | 199.000 | Sqm |
| 5 | Scaffolding | 1.000 | Each |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054