- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of PUBLIC HEALTH ENGINEERING DEPARTMENT
- >
NTID 42894886
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowLaying Of Distribution Pipe Li in Midnapore - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Laying Of Distribution Pipe Li" in Midnapore, India.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Midnapore, West Bengal, India
NTID 42894886
- Opening Date : Mon 22nd December, 2025
- Closing Date : Fri 19th December, 2025
- ₹ 932831.00
- NTID 42894886
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
18657.00 -
Document Cost
Refer Documents -
Estimated Cost
932831.00
BOQ Items Total Items : 19 | Total Qty : 4002
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Supplying HDPE (Materials grade PE-100) pipes conforming to IS 4984- 1995 with latest revision & amendments if any with necessary HDPE specials (excluding cost of CIDF valves) including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder,road sub-grade and aits flank but excluding moorum laterite or sand stone / hard rock cutting with chisel required including cutting road flank/ brick pavement etc. without damaging the exisiting telephone/electrical cable line etc.(in case of damage of any type of cable line by the agency at the time of execution necessary damage charge as applicable by the respective authority will have to be brone by the agency at his own cost)upto the depth (av.) so as to maintain 1.10m.earth cushion from top of the pipe upto G.L. including loading unloading carrying lowering laying fitting fixing carefully pipes, valves and specials with the all types of jointing materials in trenches maintaining proper levels and alignment jointing the pipes and specials by butt welding/ adopting suitable method (But weld jointing with help of hydraulic tack and trimming machines, Hitter etc. for reaching at necessary melting point of HDPE pipe so that joint can be monolithic) so as to facilitate the maintenance of pipe line locally as per conventional method in future. | ||
| 2 | (A) Pressure Rating : PN 6 | ||
| 3 | (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves. | ||
| 4 | 125mm(OD) | 275.00 | metre |
| 5 | 140mm(OD) | 245.00 | metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054