ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowKiifb-construction Of Retainin in Kannur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Kiifb-construction Of Retainin" in Kannur, India.
NTID 44435811
- Opening Date : Wed 1st April, 2026
- Closing Date : Tue 31st March, 2026
- ₹ 11323186.00
- NTID 44435811
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
50000.00 -
Document Cost
6508.00 -
Estimated Cost
11323186.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Date Extension 1 | Date |
BOQ Items Total Items : 43 | Total Qty : 8462.645
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Construction of Retaining Wall | ||
| 2 | OD17086/2025-2026:Construction of cofferdam for the construction of Retaining Wall with required breadth and height, maintaining the cofferdam during construction and removing after construction etc complete ( contractor should submit the working drawing with necessary details of cofferdam and get approval of Engineer in charge before construction) | 50.000 | metre |
| 3 | OD17094/2025-2026:BAILING OUT WATER USING PUMP ABOVE 10HP AND UPTO 20HP - Bailing out water with engine and pump set above 10HP and upto 20HP, including conveyance to site and erection, cost of fuel, lubrication oil and other stores, including all operation cost etc. | 144.009 | hour |
| 4 | OD17095/2025-2026:Bailing out water using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection, cost of fuel, lubrication oil and other stories, including all operation cost etc. | 479.920 | hour |
| 5 | 3.13.1.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Manual Means - (Depth upto 3 M) | 120.000 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054