- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of LOCAL SELF GOVERNMENT DEPARTMENT
- >
NTID 43222871
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowKarimkunnam Gp Lac Ads Constru in Idukki - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Karimkunnam Gp Lac Ads Constru" in Idukki, India.
- Opening Date : Fri 26th December, 2025
- Closing Date : Wed 24th December, 2025
- ₹ 847457.00
- NTID 43222871
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 9 | Total Qty : 3663.492
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | ROAD RETARRING | ||
| 2 | 3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 17.640 | cum |
| 3 | OD285145/2025-2026:Providing and fixing road side handrails with GI pipes with horizontal and vertical allignment including all cost conveyenece labour charges etc complete .Details of cost for hand rail of railing of two flights of staircase, length of hand rail = 5.40 m i.e. 20.09 kg | 372.312 | kg |
| 4 | OD285146/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. | 43.390 | cum |
| 5 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (B) 75 mm thick :- (II) Bitumen (S-65) | 225.700 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054