- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Irrigation Department
- >
NTID 47107913
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowJanpad Kanpur Nagar Me Ranjeet in Nawabganj - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Janpad Kanpur Nagar Me Ranjeet" in Nawabganj, India.
Irrigation Department
Nawabganj, Uttar Pradesh, India
NTID 47107913
- Opening Date : Thu 22nd October, 2026
- Closing Date : Thu 22nd October, 2026
- ₹ 510000000.00
- NTID 47107913
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
10200000.00 -
Document Cost
2800.00 -
Estimated Cost
510000000.00
BOQ Items Total Items : 14 | Total Qty : 217794
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork in excavation for foundation in Wet Earth for RCC trough/drain Structure, excluding dewatering charges, including all lifts and lead up to 30 m, including all materials, labour, tools and plant (T&P) etc., complete in all respects as per Irrigation Department (ID) specifications and as directed by the Engineer-in-Charge. | 91838 | Cum |
| 2 | Providing and laying C.C. 1:3:6 with cement, coarse sand and stone aggregate of 20–40 mm gauge for foundation, including all materials, labour, tools and plant (T&P), etc., complete in all respects as per ID specifications and as directed by the Engineer-in-Charge. | 7156 | Cum |
| 3 | Providing and laying in position machine-batched and machine-mixed design-mix R.C.C. M-25 grade concrete for reinforced cement concrete work, including providing and mixing approved PCE-based superplasticizer admixture (SikaPlast 4206 or equivalent) in M-25 concrete @ 0.25% by weight of cement to improve workability without impairing the strength and durability of concrete, all as directed by the Engineer-in-Charge. The work shall include all works up to plinth level as per ID specifications and as directed by the Engineer-in-Charge. Note: The rate of this item is based on a cement consumption of 9.0 bags per cubic metre of concrete. Any decrease in cement consumption as per the approved mix design shall result in a corresponding reduction in the rate of this item. | 27212 | Cum |
| 4 | Centering and shuttering for RCC work, including the hire/rent charges of shuttering materials, labour, tools and plant (T&P), etc., required for completion of the work for columns, walls, etc., complete in all respects as per ID specifications and as directed by the Engineer-in-Charge. | 39968 | Sqm |
| 5 | Providing steel reinforcement, including the cost of all materials, labour, tools and plant (T&P), including cutting, bending, binding and placing the reinforcement in proper position, required for completion of the work, complete in all respects as per ID specifications and as directed by the Engineer-in-Charge. | 2146 | MT |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054